top of page
WORKS by JD

Why Design Build Remodeling?

Updated: Oct 27, 2023

What is design-build?  The design-build method of remodeling, used by WORKS by JD aligns the design and construction sides of your project, ultimately saving you time and money.  Design-build is a construction delivery method used to simplify communications and accountability of the design and construction sides of your project.  For about the past 150 years an opposing method, DESIGN-BID-BUILD became the norm. There is currently a very active movement in the construction industry to deliver projects using design-build vs. design-bid-build.  The design–build method creates a single point of responsibility for the project and minimizes the homeowner’s risk, cost overages and delays. We handle the design portion of your remodel as part of our DESIGN + BUILD APPROACH


The Traditional Approach

The traditional approach for construction projects over the past 150 years has been Design-Bid-Build, but that is changing.   This process consists of the appointment of a designer on one side, and the appointment of a contractor on the other side of your project. The homeowner hires an architect/designer and then hires the contractor/builder individually.  The owner must manage two separate contracts which all-too-often creates an adversarial relationship between the designer and the contractor.  Since the design and construction teams are not always on the same page, there is often conflict. If there are unforeseen changes, the designer and contractor blame each other.  This conflict adds to the project cost and extension of timelines.



Design-Build Remodeling Method

The Design-Build method changes that traditional sequence of work. The homeowner hires the contractor/builder whom subcontracts the architect/designer or vice versus.  This provides the client with a single point of responsibility, having a drastic impact on reducing risks and overall costs.  Since we are a builder , we will use the Builder Driven Design Build Method.  The architect/designer is managed by the builder/contractor, just like other subcontracted specialty trades, such as electrical, plumbing, etc.  If there is an unforeseen change in the project, the builder ultimately has ownership of it and must work with his subs to resolve it, this now includes the design team. The builder remains the primary contact and primary force behind the work through the entire process from start to finish.  The contractor is in control of the quality of work and the warranty. Therefore, it is the contractor that is responsible for the repair of any issues after completion.  According to the Design-Build Institute of America,  this process has been proven to reduce the number of delays in a project as well as cost overages.

Although there are several models of Design-Build, WORKS by Jesse DeBenedictis utilizes the BUILDER LED DESIGN-BUILD METHOD depicted in this graphic.


The WORKS by JD Way

No matter what price a contractor gives you at the time of initial estimate, until your project is designed, planned and your finishes selected the price of your project is an unknown.  The WORKS by JD Team does it’s best to learn about your project and provide our best guess estimate of what the total cost of project will be. We use data from our recent job history and current projects to provide you with your “target budget range.”

At this point, if the target budget is within your means, we move forward to a PROJECT PLANNING SERVICE AGREEMENT.  This agreement and fees collected are a nominal deposit on the preconstruction Planning & Design phase of your project.   We will work with you to select a designer, architect, or engineer best suited for your project and subcontract them.  Once the design team is in place, we will make several visits to your property to refine the design and scope. Shopping lists and preferred vendors are provided to you and your planner will start collecting quotes from specialty trades (electric, plumbing etc.).

Once your selections and quotes start rolling in, your project planner builds your budget.  About halfway through the PPS process you will have a first budget review with your planner.  This is when the true cost of your projects begins to gel.  The next step (if needed) is to refine your budget by changing the scope of work or materials selected.  Upon approval of the final budget, your detail scope of work and contract are written.  Once the contract for work has been signed, we will order specialty and time critical materials and build a schedule based on the scheduled delivery dates.  This expedites your construction timeline and reduces the delays caused by material availability.

As you know, we then go a step further by backing our craftsmanship on your home with a  5-year Warranty.


15 views0 comments

Recent Posts

See All

Comentários


Os comentários foram desativados.
bottom of page